WBM Grading I & II Rate Analysis Calculator - Maharashtra PWD

Grading I and Grading II Rate Difference Calculator
in Maharashtra PWD (Civistimate) as per Nashik Circle Guidelines

Grading I/Grading II (WBM) Rate Analysis Calculator

This calculator helps compute rate differences for Water Bound Macadam (WBM) Grading I and II based on PWD guidelines.

Item Descriptions

Grading I: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading I (Using Screening Type A (13.2 mm) Aggregate)

Grading II: Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting with vibratory roller to the required density. By Mechanical Means - Grading II (Using Screening Type B (11.2 mm) Aggregate)

Any corrections or suggestions are welcome!

Note: Input values in editable fields only. Consumption values are approximate loose quantities per m³ compacted volume (adjust based on site trials as per MoRTH Clause 404).

Lead charges to be added manually from relevant rate analysis (no automatic calculation provided).