Precautions During Concreting of Girders Around Bearings
Bridge Construction | Bearing Protection | Girder Concreting | Quality Control
Bridge bearings are critical structural components that transfer loads from the superstructure to the substructure while allowing the required rotation and, where applicable, longitudinal movement of the bridge girder.
During girder concreting, particular care must therefore be taken to ensure that concrete, cement slurry, mortar or construction debris does not enter or accumulate around the bearing assembly.
Inadequate sealing of the girder formwork around bearings can allow fresh concrete and cement slurry to spill into the bearing zone. Once this material hardens, it may restrict the intended movement or rotation of the bearing and can result in unintended restraint of the bridge superstructure.
Key Takeaways
- Prevent concrete ingress into and around the bearing assembly.
- Seal all formwork joints and gaps around the bearing before concreting.
- Provide suitable temporary protection over exposed bearing components.
- Avoid excessive vibration immediately adjacent to the bearing.
- Inspect the bearing zone immediately after removal of formwork.
- Remove all temporary protective materials and hardened concrete that could restrict bearing movement.
- Always follow the approved drawings, project specifications and bearing manufacturer's installation instructions.
2. Precautions Before Concreting
3. Precautions During Concrete Placement
4. Removal of Temporary Protection
5. Post-Concreting Inspection
6. Precautions for Different Bearing Types
7. Balanced Cantilever Girders
8. Common Causes of Bearing Contamination
9. Site Inspection Checklist
10. Frequently Asked Questions
11. Conclusion
1. Recommended Formwork Arrangement Around Bearings
To prevent concrete and cement slurry from entering the bearing zone, the girder formwork should be properly sealed around the bearing plate. The arrangement shown below provides a practical method for protecting the bearing during concreting.
2. Precautions to be Taken Before Concreting
Extreme care should be taken before starting concreting to ensure that the bearing assembly is properly protected.
- Seal the formwork properly: The asphalt pad and planks around the bearing should abut tightly against the bearing plate, leaving no gap through which concrete or cement slurry can escape.
- Provide additional protection: Where specified or approved, approximately 1/16-inch tar paper or another suitable temporary protective material may be placed over the bearing plate to prevent contamination.
- Inspect all joints: Check corners, joints and interfaces around the bearing for possible leakage paths before concrete placement.
- Keep the bearing clean: Remove dust, dirt, concrete particles, oil and construction debris from the bearing zone.
- Provide temporary protection: Suitable covers or protective sheets may be provided where necessary to protect exposed bearing components.
3. Precautions During Concrete Placement
The bearing protection arrangement should remain effective throughout concrete placement and compaction. Particular attention is required because vibration can force cement slurry and fine mortar through small gaps in the formwork.
- Do not discharge concrete directly onto the bearing assembly.
- Avoid excessive vibration immediately adjacent to the bearing.
- Needle vibrators should be operated carefully and should not come into direct contact with bearing components.
- Continuously monitor the formwork for leakage of cement slurry or mortar.
- If leakage occurs, correct the leakage path before continuing the concreting operation in that area.
4. Removal of Temporary Protection
Temporary asphalt pads, planks and other protective materials provided around the bearing should be removed during striking of the girder formwork or centering, as applicable.
Such materials must not be inadvertently left around the bearing in a manner that could restrict its movement or rotation.
After removal of the formwork, the bearing zone should be thoroughly inspected. Hardened concrete, mortar or cement slurry should be removed using an approved method that does not damage the bearing, bearing plate, anchor arrangement or protective coating.
5. Post-Concreting Inspection
A systematic inspection should be carried out after formwork removal and before proceeding to the next stage of construction.
- No hardened concrete or mortar should connect the bearing to adjacent concrete.
- The bearing assembly should be free from construction debris.
- The required movement and rotation should not be obstructed.
- Anchor bolts and bearing components should be clean and undamaged.
- There should be no unintended bonding between bearing components and surrounding concrete.
- The installation should conform to approved drawings and the bearing manufacturer's requirements.
A bearing partially or completely restrained by hardened concrete or mortar may be unable to accommodate the movement and rotation for which it was designed. Depending on the structural system and bearing type, unintended restraint may result in additional forces being transferred to the girder, pier, abutment or other structural components.
6. Precautions for Different Types of Bearings
Elastomeric Bearings
Prevent concrete, mortar and construction debris from contaminating the elastomeric surface or interfering with the intended deformation of the bearing.
Pot Bearings
Particular attention should be given to preventing concrete ingress around moving components and sliding interfaces.
PTFE Sliding Bearings
Sliding surfaces should be protected from concrete, mortar, dust and other contaminants that may adversely affect the intended sliding movement.
Spherical Bearings
Rotational components should remain clean and unobstructed throughout construction. Temporary protection should be removed after completion of the relevant construction activity.
7. Application to Balanced Cantilever Girders
The same fundamental principle of preventing concrete ingress applies to articulations and bearing arrangements associated with balanced cantilever girders.
For balanced cantilever and other structurally sensitive erection systems, additional temporary restraints, hold-down arrangements or specific concreting sequences may be required depending on the approved structural design and erection methodology.
Such arrangements should be executed strictly in accordance with the approved drawings, erection scheme and method statement.
8. Common Causes of Bearing Contamination
| Cause | Possible Consequence | Preventive Measure |
|---|---|---|
| Poorly sealed formwork | Cement slurry leakage | Seal all joints and gaps before concreting |
| Excessive vibration near bearing | Mortar migration into gaps | Controlled vibration and correct vibrator positioning |
| Inadequate temporary protection | Concrete contamination | Provide suitable temporary covers or barriers |
| Failure to inspect after concreting | Hardened concrete remains undetected | Inspect immediately after formwork removal |
9. Site Inspection Checklist
The following checklist can be used by the site engineer before, during and after concreting of girders around bearings.
| No. | Inspection / Control Item | Status |
|---|---|---|
| 1 | Bearing installed and positioned as per approved drawing | ☐ |
| 2 | Bearing and surrounding area clean and free from debris | ☐ |
| 3 | Formwork properly sealed around bearing | ☐ |
| 4 | Temporary protective covering provided where required | ☐ |
| 5 | Asphalt pads/planks abut tightly against bearing plate | ☐ |
| 6 | Approved temporary protection provided over exposed bearing parts | ☐ |
| 7 | Concrete not directly discharged onto bearing | ☐ |
| 8 | Needle vibrator kept away from bearing components | ☐ |
| 9 | Formwork monitored for cement slurry/mortar leakage | ☐ |
| 10 | Any leakage immediately sealed/corrected | ☐ |
| 11 | Temporary protection removed after formwork striking | ☐ |
| 12 | Hardened concrete/mortar removed without damaging bearing | ☐ |
| 13 | Bearing movement and rotation are not obstructed | ☐ |
| 14 | Anchor bolts and bearing components clean and undamaged | ☐ |
| 15 | Final inspection completed before next construction stage | ☐ |
📋 Download Bridge Bearing Inspection Checklist
A printable PDF checklist is available for site engineers, consultants and contractors to use during girder concreting and bearing inspection.
⬇ Download PDF ChecklistPrintable inspection checklist for bridge bearing protection during girder concreting.
10. Frequently Asked Questions
What happens if concrete enters around a bridge bearing?
Hardened concrete or mortar around the bearing can restrict its intended movement or rotation. This may create unintended restraint and additional forces in the bridge structure.
Why is formwork sealing important around bearings?
Proper sealing prevents cement slurry and fresh concrete from escaping through gaps in the formwork and entering the bearing zone.
Should the bearing be covered during concreting?
Suitable temporary protection should be provided wherever required by the approved construction arrangement, project specifications or bearing manufacturer's instructions. The protection should not interfere with the bearing's installation or intended function.
Can excessive vibration affect the bearing?
Excessive or poorly controlled vibration near the bearing can force cement slurry and fine mortar through small gaps in the formwork. Controlled vibration and properly sealed formwork help minimize this risk.
When should temporary protection around the bearing be removed?
Temporary protection should be removed at the appropriate stage specified by the approved construction methodology, generally during or after removal of the relevant formwork or centering. It should not be left in a position that could restrict bearing movement.
Which documents should be followed for bearing installation?
The approved structural drawings, project specifications, method statement, applicable standards and the bearing manufacturer's installation instructions should be followed. Where requirements differ, the approved project documentation and instructions of the responsible design/engineering authority should be referred to.
11. Conclusion
Proper protection of bearings during girder concreting is a relatively simple construction measure but is extremely important for the long-term performance of a bridge.
The primary objective is to ensure that concrete, mortar, cement slurry and construction debris do not enter or harden around the bearing components.
Properly sealed formwork, suitable temporary protection, controlled concrete placement, appropriate vibration practices and thorough post-concreting inspection together provide an effective means of preventing bearing contamination and unintended restraint.
The recommended arrangement should be incorporated into the girder formwork details and checked by the site engineer before commencement of concreting.
This article is intended for general technical and construction guidance. The dimensions, materials and temporary protection arrangements shown in the accompanying sketches should be adopted only where they are consistent with the approved structural drawings, project specifications, construction methodology and bearing manufacturer's requirements. This article should not be treated as a substitute for project-specific engineering instructions.
Bridge Engineering Technical Reference
Topics: Bridge Bearings • Girder Concreting • Bearing Protection • Prestressed Concrete Girders • Bridge Construction • Formwork • Construction Quality Control