YogiPWD

CSR calculations When Bitumen Difference is deducted from Basic Rate

CSR Calculator

CSR (When Bitumen Difference is deducted from Basic Rate)

Quantities for Bituminous Items (in appropriate units)

BM
Item 3.4 → BM Batch mix Plant
Item 3.42 → BM Drum mix Plant
OGC / Prime / Tack / Seal
Item 51.139a → OGC Over BT batch Mix Plant
Item 4.12 → OGC Over MPM Drum Mix Plant
Item 51.139b → OGC Over MPM Batch Mix Plant
Item 3.31 → Tack Coat @ 3.00 kg/m²
Item 3.33 → Tack Coat @ 3.25 kg/m²
Item 3.30 → Tack Coat @ 2.50 kg/m²
Item 3.32 → Tack Coat @ 2.75 kg/m²
Item 4.01 → Seal Coat @ 0.98 kg/m²
Item 3.29 → Prime Coat
MPM 75 mm
Item 3.35b → MPM 75 mm on WBM 100%
Item 3.35a → MPM 75 mm on WBM 30%+70%
Item 3.36b → MPM 75 mm on BT 100%
Item 3.36a → MPM 75 mm on BT 30%+70%
MPM 50 mm
Item 3.37b → MPM 50 mm on WBM 100%
Item 3.37a → MPM 50 mm on WBM 30%+70%
Item 3.38b → MPM 50 mm on BT 100%
Item 3.38a → MPM 50 mm on BT 30%+70%
BC & DBM
Item 3.48 → BC Batch Mix Plant 5.2%
Item 3.50 → BC Drum Mix Plant 5.4%
Item 3.44 → DBM Batch mix Plant
Item 3.46 → DBM Drum mix Plant

Total Bitumen Quantity: —

Cost Difference: —

CSR Amount: —

Percent Change: —

Post a Comment

0 Comments