EPC Project Monitoring & Schedule-H Payment Tracking System
A Professional Digital Solution for Integrated Physical Progress and Financial Billing Control
1. Introduction
This tool is a comprehensive Engineering, Procurement & Construction (EPC) project monitoring system designed to seamlessly integrate physical progress tracking with financial billing (Schedule-H).
It eliminates manual reconciliation between site progress and billing by creating a data-driven, automated linkage between executed quantities and payable amounts.
---2. Core Concept
The system operates on three interconnected layers:
- Physical Progress Layer – Tracks actual executed quantities on site
- Billing Layer (Schedule-H) – Defines payment structure through milestones and stages
- Financial Layer – Calculates payable, paid, and balance dynamically
This ensures that payments are always proportional to actual work completed, which is a key requirement in EPC contracts.
---3. Physical Progress Tracking
Each activity (e.g., DBM, PQC, Culvert, Drain, etc.) is monitored using:
- Total Quantity
- Achieved Quantity
- Automatic % Completion
Formula Used:
% Progress = (Achieved Quantity / Total Quantity) × 100
This data acts as the primary driver for all financial calculations.
---4. Schedule-H Billing System
The billing module follows a structured hierarchy:
- Milestones → Represent major project stages (e.g., Earthwork, Pavement, Structures)
- Sub-Activities (Stages) → Linked directly to physical work items
- Weightage (%) → Defines financial importance of each stage
Each stage derives its payable amount based on:
- Project Budget
- Milestone %
- Stage Weight %
- Physical Progress
5. Financial Logic
Stage Maximum Value:
Stage Value = Budget × (Milestone % / 100) × (Stage Weight % / 100)
Payable Amount:
Payable = Stage Value × (Physical Progress / 100)
Final Payment Rule:
- Payment is capped at executed value
- No overpayment allowed
- Already paid amounts are deducted automatically
6. Smart Approval System
The tool includes a checkbox-based approval system where:
- Selected activities are approved in batch
- System automatically updates payable → paid
- Prevents duplicate or excess payments
7. Global Milestones (Physical Targets)
Users can define global physical milestones (e.g., 25%, 50%, 75%, 100%).
The system calculates overall physical progress in cost terms and highlights:
- Achieved Milestones
- Pending Milestones
8. Data Management System
The tool uses IndexedDB (Browser Database) for:
- Offline data storage
- Multi-project handling
- Fast performance without server dependency
9. Smart JSON Import / Export
A powerful data portability system is built-in:
- Export single / multiple / all projects
- Import with smart merge logic
Smart Merge Features:
- Project matching by name
- Duplicate prevention
- Latest progress preservation
- Max-value logic for quantities and payments
10. Visualization (Progress Chart)
A dynamic bar chart provides:
- Activity-wise progress (%)
- Instant visual performance tracking
- Better decision-making for engineers and managers
11. PDF Reporting
The system generates a professional report including:
- Project summary
- Financial progress
- Physical progress
- Schedule-H breakdown
- Graphical representation
12. Key Advantages
- ✔ Eliminates manual billing errors
- ✔ Ensures payment transparency
- ✔ Links field progress with finance
- ✔ Supports EPC contract compliance
- ✔ Works offline (no server required)
- ✔ Scalable for multiple projects
13. Ideal Use Cases
- Highway Projects (Flexible & Rigid Pavements)
- Bridge & Structure Works
- Urban Infrastructure Projects
- Government EPC Contracts
- PMC & Contractor Billing Systems