Tree Transplantation Decision & Survey Register
Field screening for highway / infrastructure projects: retain where possible, assess transplantation, and document possible felling candidates and replacement planting.1. Project settings
Multiplier is a budgeting assumption only, not a universal legal rule. Use the actual written permission and applicable law to determine compensatory planting.
2. Add field observation
Visual observations (select all that apply)
Measure girth at about 1.3 m above ground where practicable. DBH is diameter, not circumference. Do not infer root type from species name alone if field evidence is absent.
3. Summary
Provisional replacement planting estimate: 0 trees.
Potential felling is a screening result only—not authority to fell. It means feasibility appears low under the entered assumptions and needs alternatives review, expert recommendation and statutory approval.
4. Tree-by-tree register and reports
| ID / Location | Species | Measurements | Screening outcome | Reasons / follow-up | Action |
|---|---|---|---|---|---|
| No trees entered yet. | |||||
5. Decision logic and technical cautions
- Retain in place first: test alignment, widening, utility and construction alternatives.
- Assess health, root architecture, size, access, root-ball feasibility and receiving-site suitability.
- Refer uncertain, heritage/protected, structurally defective or large mature trees for expert review.
- Only consider felling after alternatives are documented and competent authority grants permission.
Retain / avoid In-situ retention should be prioritised.
Potential transplant Candidate for expert assessment and method statement.
Expert review Uncertainty or conflicting observations.
Potential felling Low screening suitability; approvals still required.
Rule-based screening only; no numerical survival probability is claimed.
Research references
- ICFRE / Forest Research Institute — Tree Translocation in India: pre-treatment, species/health assessment, root ball, pruning and receptor site.
- Maharashtra (Urban Areas) Protection and Preservation of Trees Act, 1975 — Section 8 reference: verify current amendments, jurisdiction and written permission conditions.
- CPCB report hosted by NGT: site assessment, timing, tree selection, root preparation and documentation.