Calculation of Loose Thickness from Expected Compacted Thickness
SSR items for DBM, BM, BC, OGC etc. specify compacted thickness. However, during laying, material is placed in a loose condition and undergoes compaction due to rollers and future traffic.
Loose Thickness Calculator
\[
\text{Loose Thickness Factor}
= \left( \frac{1 - Q_f}{v_i} \right)(1 + C_{LL})
\]
\[
\text{Loose Thickness}
= \text{Factor} \times \text{Compacted Thickness}
\]
Loose Thickness Factor: —
Recommended Loose Thickness: — mm
Important Engineering Note:
Future traffic compaction is a performance assumption.
It should NOT be deducted from RA bills unless explicitly specified in
contract conditions or MoRTH/IRC specifications.
Suggestions and peer review are always welcome 👍
0 Comments
If you have any doubts, suggestions , corrections etc. let me know