Bituminous Mix Design Manual (DBM & BC)

Bituminous Mix Design Methodology (DBM & BC)

Standard Marshall Mix Design, Volumetric Property Evaluation & Job Mix Formula Formulation

1. Executive Summary & Design Objectives

Bituminous Mix Design for Dense Bituminous Macadam (DBM) and Bituminous Concrete (BC) aims to specify an optimal aggregate blend and binder content. The goal is to provide sufficient asphalt binder for durability, adequate mix stability under traffic loading, specified air voids ($V_a$ / $VIM$) to accommodate secondary compaction, and suitable workability during placement.

flowchart TD %% === START === A["Test of Bitumen:
As per IS 73:2013 / IRC SP 53:2010"] B["Collection of Aggregate Samples
and Bitumen Samples"] C["Tests of Coarse and Fine Aggregates:
Sieve Analysis, L.A Abrasion, Impact, Flakiness & Elongation, Coating & Stripping etc."] D["Test of Filler:
Gradation, PI"] E["Blending of Coarse, Fine Aggregates and Filler
to Arrive at Specified Gradation"] F["Arriving at Aggregate and Filler Proportions
based on Blending"] G["Heating Bitumen & Aggregates Separately for Marshall Specimens
(as per IRC 111:2009, 1150–1250g dry aggregate)"] H["Mixing Aggregate & Bitumen (Temp Diff ≤14°C)
Prepare Marshall Specimen – 75 Blows on Each Side"] I["Repeat for Different Bitumen Contents
at 0.5% Intervals (Min 3 per Content)"] J["Extrude Specimen and Measure
Thickness & Specific Gravity"] K["Test Marshall Specimens at 60°C ±1°C for 30 min
Measure Stability & Flow"] L["Analysis: Plot Curves
Bitumen Content vs Stability, Flow, VIM, VFB, VMA"] M["Determine Optimum Bitumen Content (OBC)
Based on Stability, Flow, VIM, VFB, VMA"] N["Check OBC with Specification Requirements"] O["Prepare Job Mix Formula (JMF):
Coarse %, Fine %, Filler %, Bitumen %"] P["Use JMF in Hot Mix Plant"] %% === Connections === A --> B --> C --> D --> E --> F --> G --> H --> I --> J --> K --> L --> M --> N --> O --> P %% === Subgraphs === subgraph Material_Testing ["MATERIAL TESTING & GRADATION"] B C D E F end subgraph Marshall_Preparation ["MARSHALL SPECIMEN PREPARATION"] G H I J end subgraph Testing_Analysis ["TESTING & ANALYSIS"] K L M N end subgraph Output ["JOB MIX FORMULA"] O P end %% === Class Definitions === classDef title fill:#f0f0f0,stroke:#d9d9d9,stroke-width:1px,font-weight:bold; classDef standard fill:#e6f7ff,stroke:#1890ff,stroke-width:1.5px,rx:6px,ry:6px; classDef process fill:#fff7e6,stroke:#fa8c16,stroke-width:1.5px,rx:6px,ry:6px; classDef output fill:#f6ffed,stroke:#52c41a,stroke-width:1.5px,rx:6px,ry:6px; classDef analysis fill:#f9f0ff,stroke:#722ed1,stroke-width:1.5px,rx:6px,ry:6px; class A title; class B,C,D,E,F standard; class G,H,I,J process; class K,L,M,N analysis; class O,P output;
Note: VIM = Voids in Mix ($V_a$), VMA = Voids in Mineral Aggregate, VFB = Voids Filled with Bitumen ($VFA$)

2. Sequential Execution Guidelines

Phase 1: Material Qualification & Aggregate Blending

Bitumen (conforming to IS 73:2013 or modified binder per IRC:SP:53) and coarse/fine aggregates are subjected to laboratory screening. Individual aggregate fractions are blended mathematically and experimentally to fit the designated sieve gradation curve specified in MoRTH Section 500 / IRC:111-2009.

Phase 2: Marshall Specimen Fabrication

Paving mixtures are prepared across a trial binder content spectrum (typically 0.5% increments, with a minimum of 3 specimens per trial percentage). Aggregates (approx. 1150g–1250g per specimen) and asphalt binder are heated separately. The temperature difference between aggregates and binder during mixing must not exceed 14°C. Specimen compaction requires 75 blows per face using a standard Marshall compaction hammer.

Volumetric Evaluation Protocol: Compacted specimens are extruded after cooling, followed by bulk specific gravity ($G_{mb}$) determination. Volumetric parameters—Air Voids ($VIM/V_a$), Voids in Mineral Aggregate ($VMA$), and Voids Filled with Bitumen ($VFB/VFA$)—are derived using Maximum Theoretical Specific Gravity ($G_{mm}$) data.

Phase 3: Thermal Water Bath & Marshall Stability Testing

Specimens are conditioned in a water bath held at 60°C ± 1°C for 30 to 40 minutes prior to testing. Marshall Stability (maximum load sustained in kN) and Flow (plastic deformation in mm) are recorded on standard breaking heads at a loading rate of 50.8 mm/min.

Optimum Bitumen Content (OBC) Selection: Response curves are plotted for Bitumen Content vs. Stability, Flow, Bulk Density, $VIM$, $VMA$, and $VFB$. OBC is selected where target air voids (typically 4.0% for DBM/BC) are met while ensuring all strength and volumetric limits satisfy statutory standards.

Phase 4: Job Mix Formula (JMF) Approval

Plant Execution: Upon confirming OBC compliance, a formal Job Mix Formula (JMF) document is generated. The JMF specifies cold-feed bin percentages, filler proportions, target bitumen percentage, and mixing/laydown temperature windows for Hot Mix Plant operations.

3. Marshall Volumetric Criteria (MoRTH / IRC Specifications)

Mix Parameter Dense Bituminous Macadam (DBM) Bituminous Concrete (BC)
Compaction Blows (Each Face) 75 75
Minimum Marshall Stability (60°C) ≥ 9.0 kN ≥ 12.0 kN
Marshall Flow Value 2.0 mm – 4.0 mm 2.0 mm – 4.0 mm
Target Air Voids ($VIM / V_a$) 3.0% – 5.0% (4.0% target) 3.0% – 5.0% (4.0% target)
Voids in Mineral Aggregate ($VMA$) ≥ 12.0% – 14.0% (based on nominal max size) ≥ 14.0% – 15.0%
Voids Filled with Bitumen ($VFB / VFA$) 65% – 75% 65% – 75%
Retained Tensile Strength (RTS) ≥ 80% ≥ 80%
Yogendra Gopal Borse

Yogendra Gopal Borse

Civil Engineer | Assistant Engineer Grade-I, Maharashtra PWD

B.Tech (Civil) from VJTI Mumbai. Experienced in bridge design, road works, estimation, project monitoring and digital engineering tools. Creator of YogiPWD – practical technical resources for civil engineers.

Read full About →